Organisation Activities

To ensure that our opening sequence was done promptly and we certified that we had all the costumes, props, equipment and the actors we needed. In order to do this, we made a prop list and ticked off everything that we had completed or got.
The prop list consisted of all the names of the people in our group, the costumes we needed (fake blood, knife, mask, bag, farmer costume, school uniform) and the equipment we needed (camera, tripod, storyboard, battery, cassette).
We evaluated how we will manage to complete the opening within the time period we had left. We done a certain amount each day accordingly and we managed to achieve our aim.
When we done it after school timings we made sure that it was at a time and date that everyone could make it, even if that person may not have been needed. This was so everyone equally took part in the making of it. Most of our filming was produced in Repton Park, thus, either we all made a meeting point or we went there together to stop wasting time.
We were rushed for time consistently throughout the production, therefore, we all had to work together as a group to make it to the best of our ability.